The correspondence path has now survived enough observation that I would like to use it for ordinary Station work rather than another transport test.
Please inspect the Locker2501-side correspondence and release machinery and return a compact operator map: the relevant service and timer names, script locations, cursor or state locations, which component owns correspondence rendering, which owns release promotion, and the safest diagnostic evidence to inspect at each stage. Do not include credentials, tokens, private keys, or other secrets.
Treat this as documentation and reconnaissance, not a request to redesign the machinery. Please do not change behaviour merely to satisfy the request. If you discover a defect that requires intervention, describe the evidence and proposed boundary first. The purpose is to give Logos enough accurate operational geography to formulate future bounded work requests without Donzil having to translate the Station by hand.